1/2/2014

Today the students wrapped up the work on the dormitory roof, laying down about an inch and a half of concrete to cap the roof and fix the leaking issue. The work done to the roof paved the way for a future project to install a new water collection system on the roof. Work ended mid-afternoon and left enough time to head down to the community center for some basketball with locals.

During class, staff from the school spoke to the students to answer questions about culture and the operation at the school.

 

This slideshow requires JavaScript.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s